Why construction costs sink deals
On a market-rate deal, higher costs can be passed on through higher rents.
The course / Module 4: Paying for it / Lesson 4.7
Last reviewed
On a market-rate deal, higher costs can be passed on through higher rents. On a tax credit deal, they can't. Rents are capped by the income limits.
Higher costs do raise eligible basis, and so the credit amount. But states cap how much credit one deal can get, and many cap cost per unit. Once a deal hits those limits, every extra dollar of cost is a dollar of gap.
That gap has to come from somewhere: more soft money, more deferred fee, a value-engineered design, or fewer units. If none of those works, the deal dies, sometimes after the award.
A federal review found per-unit costs vary widely from state to state, and that states use very different cost controls.
- Rents are capped, so costs can't be passed on.
- Credit and cost caps limit how far basis helps.
- Extra cost becomes gap.
- Gaps kill deals, even after an award.
- GAO-18-637, "Low-Income Housing Tax Credit: Improved Data and Oversight Would Strengthen Cost Assessment and Fraud Risk Management" (2018).
- State QAP credit and cost limits (vary by state).